Tuesday, October 9, 2012

Basement Update: Pre-Insulation

 
I last updated you on plans to finish the basement clear back in February.
Well, first let's go over some before pictures.
 
Coming down the stairs...

...looking at the space that will be a hallway and a bedroom... 
 

 
...slightly shifted view, the heater and the electric panel will be in the utility room...

 
...the small window to the right of the heater is the window for the bathroom...
 


...and the sub plumbing sticking up out of the concrete for the bathroom...
 

 
...and finally, the view of the area we are not finishing, the storage area.
 
 
 
Curt helped me put up the top and bottom plates of each wall, and then I completed the framing by installing all of the vertical members and the doorways.
 
Then I had to think.
I want this project to be done before the baby comes, so that I don't need to worry about it anymore and so that our guest capacity is increased.
I had planned on doing all of the electrical and plumbing...but judging by how long it took me to get the framing done while being a mom to Des this plan looked to be in direct conflict with the deadline I wanted.
 
So I gathered estimates from contractors.
Sidenote: always get multiple bids for every trade...you save a lot of $ that way
Rough electric, plumbing, and HVAC were completed in the last couple of weeks.
I've passed the municipal plumbing, electric, and mechanical inspections.
I'm insulating today and tomorrow, getting that inspected Thursday or Friday, and hope to have the drywallers in next week.
 
Here are pictures that were current as of this morning:
 
In the bathroom looking down the hall...
 
 
...in the bedroom looking at the closets...


 
...in the bedroom with my back to the closets...


...utility room...


 
...view from the storage room looking into the bathroom, the end of the hallway, and the utility room...


 
...bathroom...

 
...am I the only one who thinks rough plumbing and electrical are pretty?...yes?...just checking...
 
 
 
After the drywallers it's all back on me (and Curt, when he has time to help).
I've ordered and received the flooring.
I've ordered and received the subway tile that will line the shower floor to ceiling.
I've got an old, beautiful buffet that I'm turning into a vanity and I've got the bathroom mirror.
I'll prime and paint.
I'll do the finish plumbing and HVAC.
 
I take it back...the electricians do come back and install all of the outlets, switches, and can light trims. Sweet.
 
I have right around a month to get this all done...I think I can do it, but I'll keep you updated.
 
 


5 comments:

Alicia said...

Way to go, looks great!

Sharee said...

You are absolutely INSANE and completely amazing. I honestly just cannot believe your talent. I am always completely awe-struck.

Alan said...

Seriously love these posts. It's so interesting to see the process (and so impressive what you guys accomplish!)

Curt Hostetler said...

@ Alan - so long as you know that 'you guys' really should just read 'Carmen'...I've been pretty uninvolved with this project (and most others). I'm a lucky guy.

Carolyn said...

Carmen, have I ever told you that you are wonder woman? Because you are.

where you readers come from